# Major overhaul of Steam Turbine FFA10 in 2024

- **Source:** TED · `75895-2024`
- **Buyer:** Fjernvarme Fyn Affaldsenergi A/S
- **Published:** 2024-02-05
- **Deadline:** —
- **Estimated value:** 4,000,000 DKK
- **CPV codes:** 50000000, 42113000, 42113100, 51130000, 42112000, 45315200, 42112100, 51133000
- **Place-of-performance NUTS:** DK031, DNK
- **Buyer-address NUTS:** —
- **Notice type:** cn-standard / 17

## Procedure details

Source lists may span several lots; list positions do not establish relationships.

### Procedure Types

- neg-w-call

### Award Criterion Descriptions

- Technical Solution
- Time Schedule
- HSE
- Pris

### Options

- Options are defined in the tender material.<br>

### Submission Urls

- https://www.comdia.com/fjernvarme-fyn/tenderinformationshow.aspx?Id=167963

## Description

Fjernvarme Fyn Affaldsenergi (FFA) is located Havnegade 120, DK-5000 Odense C, only a few kilometres from the city centre.The power plant consists of a coal-fired CHP unit 7, a straw-fired CHP unit 8 and a waste incineration plant with three waste-to-energy boilers (Line 11, Line 12 and Line 13) providing steam to two steam turbines (FFA10 and FFA13).FFA10 is a waste fired CHP plant. It was commissioned in 1996 and has a capacity of 11/13 MW electricity and 29 MJ/s district heating.<br><br>The steam turbine is planned to be in operation until 2032 (as a minimum).<br>The scope of supply for this tender is a major overhaul of the FFA10 steam turbine, gear and generator.The main target with the major overhaul is to ensure that the unit is in a condition where it can be operated safely, reliably and efficiently until the next major overhaul.<br>

## Original notice

https://ted.europa.eu/da/notice/-/detail/75895-2024