# Plug and abandonment operations Tønder wells

- **Source:** TED · `238579-2024`
- **Buyer:** Gas Storage Danmark A/S
- **Published:** 2024-04-23
- **Deadline:** —
- **Estimated value:** 4,205,253 EUR
- **CPV codes:** 76100000
- **Place-of-performance NUTS:** DK032, DNK
- **Buyer-address NUTS:** —
- **Notice type:** can-standard / 30

## Procedure details

Source lists may span several lots; list positions do not establish relationships.

### Procedure Types

- neg-w-call

## Description

Gas Storage Denmark A/S, a part of Energinet, has the intention to perform final plug and abandonment operations on their wells near to the town of Tønder planned for execution from Q3 2023. The three wells were drilled and tested in the early eighties (1983/1984). The wells were drilled to evaluate the possibility to establish natural gas storage facility, however, the gas storage facility was never established and it has been decided to plug and abandon the well permanently. The wells were drilled to a depth of 1636 to 1847 meter. The three wells have never been used for production or gas storage.

## Award result

- **Published notice total:** 4,205,253 EUR
- **Contract concluded:** 2024-04-17
- **Winner:** WSG Coil Services BV (CVR 04075911) · value 4,205,253 EUR
Published values may cover multiple lots, options and frameworks; they are not supplier revenue. Unlinked notice summaries do not assign each value or expiry to each winner.

## Original notice

https://ted.europa.eu/da/notice/-/detail/238579-2024
