# Framework Agreement for Cable Repair on the COBRAcable

- **Source:** TED · `574837-2024`
- **Buyer:** Energinet Eltransmission A/S
- **Published:** 2024-09-25
- **Deadline:** —
- **Estimated value:** 10,000,000 EUR
- **CPV codes:** 50000000, 31321300, 31321400, 31321500, 31340000
- **Place-of-performance NUTS:** DNK
- **Buyer-address NUTS:** —
- **Notice type:** cn-standard / 17

## Procedure details

Source lists may span several lots; list positions do not establish relationships.

### Procedure Types

- neg-w-call

### Award Criterion Names

- Price
- Solution
- Competences
- Contract Terms

### Award Criterion Descriptions

- See Tender Contions

### Options

- The framework agreement includes an option for the Buyer to request that the Provider stores the spare parts purchased under this framework agreement. The framework agreement also contains an option to have the Provider ensure the readiness of spare parts stored either at the Provider or at the Buyer’s storage facilities in order to ensure that the spare parts are working order at all times. For further details concerning the purchase, reference is made to the appendices to the tender documents. The total purchase is made for a period of 4 year(s) from the signing of the framework agreement with the option of an extension for 4x12 months. Orders under the framework agreement will be allocated directly to the supplier which, in the view of the Contracting Authority, has submitted the most economically advantageous tender, see section 4.1. The estimated consumption during the time period (including options of extensions) of the framework agreement is expected to amount to 10 mio. euros The consumption figures are estimates only and are consequently not binding for the Contracting Authority. The Contracting Authority is not obligated to purchase solely from the framework agreement and may in connection with single-standing purchases choose to tender these independently. Additionally, according to clause 10.2 of the contract the estimated consumption may be increased 2 x 20 %

### Submission Urls

- https://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=413240&B=

## Description

Through the establishment of the present framework agreement, the Contracting Authority wants to purchase emergency repairs and planned repairs of the land and submarine cable of the COBRAcable interconnector. The COBRAcable interconnector connects the electricity transmission grids in Denmark (DK1) and the Netherlands and is capable of transmitting 700 MW at +/- 320 kV DC. The interconnector was commissioned in 2019. The land and submarine cable was manufactured by Prysmian and the insulation material of the land and submarine cable is DC XLPE. The scope of works for this framework agreement: - Jointing works in relation to emergency repairs and planned repairs of the COBRAcable land and submarine cable - Delivery of spare parts (such as land and submarine cable joints, transition joints between land and submarine cable etc.)

## Original notice

https://ted.europa.eu/da/notice/-/detail/574837-2024