# Silkeborg Varme - Major Overhaul of GE Gas Turbines

- **Source:** TED · `778434-2024`
- **Buyer:** Silkeborg Varme A/S
- **Published:** 2024-12-19
- **Deadline:** —
- **Estimated value:** 4,000,000 EUR
- **CPV codes:** 65000000, 50500000, 65410000
- **Place-of-performance NUTS:** DK042, DNK
- **Buyer-address NUTS:** —
- **Notice type:** cn-standard / 17

## Procedure details

Source lists may span several lots; list positions do not establish relationships.

### Procedure Types

- neg-w-call

### Award Criterion Names

- Price
- Execution
- Time schedule

### Award Criterion Descriptions

- The evaluation of the sub-criterion "Price" will be based on the prices stated by the tenderer in the Price List (Appendix A), in the schedule of hourly and/or daily rates of the tenderers (rates for extra works (variations)) and in Appendix E.
- "Execution" is evaluated solely on the specific requirements and guidelines described in the procurement material.
- "Time schedule" is evaluated solely on the specific requirements and guidelines described in the procurement material.

### Options

- 4. Options 4.1 Overhaul of Stage 8 Valve 4.2 Overhaul of CDP Valve 4.3 Replacement of Global Shut-off Valves 4.4 Replacement of FOD Sock 4.5 General overhaul of Engine Mounts 4.6 Low Pressure Compressor Rotor (LPCR) 4.6.a Replacement blade of new material, unit price 4.6.b Replacement blade of refurbished material, unit price 4.7 Low Pressure Compressor Stators (LPCS) 4.7.a Replacement vane of new material, unit price 4.7.b Replacement vane of refurbished material, unit price 4.8 High-Pressure Compressor Rotor (HPCR) 4.8.a Replacement blade of new material, unit price 4.8.b Replacement blade of refurbished material, unit price 4.9 High-Pressure Compressor Stator (HPCS) 4.9.a Replacement vane of new material, unit price 4.9.b Replacement vane of refurbished material, unit price 4.10 Stage 1 High-Pressure Turbine Nozzle Assembly (S1 HPTN) 4.10.a Replacement nozzle segment of new material, unit price 4.10.b Replacement nozzle segment of refurbished material, unit price 4.11 Stage 2 High-Pressure Turbine Nozzle Assembly (S2 HPTN) 4.11.a Replacement nozzle segment of new material, unit price 4.11.b Replacement nozzle segment of refurbished material, unit price 4.11.c Replacement shrouds of new material, unit price 4.11.d Replacement shrouds of refurbished material, unit price 4.12 High-Pressure Turbine Rotor Assembly (HPTR) 4.12.a Stage 1 replacement blade of new material, unit price 4.12.b Stage 1 replacement blade of refurbished material, unit price 4.12.c Stage 2 replacement blade of new material, unit price 4.12.d Stage 2 replacement blade of refurbished material, unit price 4.13 Low-Pressure Turbine Rotor (LPTR) 4.13.a Replacement blade of new material, unit price 4.13.b Replacement blade of refurbished material, unit price 4.14 Low-Pressure Turbine Stator Case (LPTS) 4.14.a Replacement nozzle segment of new material, unit price 4.14.b Replacement nozzle segment of refurbished material, unit price

### Submission Urls

- https://www.ethics.dk/ethics/eo#/5e844f49-3a18-40d7-875a-a92a1de607f0/homepage

## Description

SV is planning for a major overhaul of the 40 MW GE gas turbine at the CHP plant in Silkeborg. The turbine was commissioned in 1995. To ensure reliable, safe, and efficient operation of the unit a major overhaul of the Gas turbine is needed.

## Original notice

https://ted.europa.eu/da/notice/-/detail/778434-2024