# CO2 Liquefaction, Storage and Truck Loading Station

- **Source:** TED · `312624-2025`
- **Buyer:** Kredsløb Holding A/S
- **Published:** 2025-05-15
- **Deadline:** —
- **Estimated value:** 150,000,000 DKK
- **CPV codes:** 45000000, 42100000, 42120000, 45250000, 45252000, 45255300, 45350000
- **Place-of-performance NUTS:** DK042, DNK
- **Buyer-address NUTS:** —
- **Notice type:** cn-standard / 17

## Procedure details

Source lists may span several lots; list positions do not establish relationships.

### Procedure Types

- neg-w-call

### Award Criterion Names

- Project Economy
- Contractual Terms
- Technical Solution
- Project Execution
- QHS and Sustainability

### Award Criterion Descriptions

- Under the sub-criterion Project Economy, Kredsløb will evaluate the expected economy of the solution offered by the tenderer. Please refer to the Tender Conditions for further information.
- Under the sub-criterion Contractual Terms, Kredsløb will evaluate the tenderer's deviations from the CLP Agreement. Please refer to the Tender Conditions for further information.
- The sub-criterion Technical Solution will be evaluated based on the following sub-sub-criteria and weights: Plant Flexibility: 40 % Process Design: 25 % Layout: 25 % Quality of Equipment: 10 % Please refer to the Tender Conditions for further information.
- The sub-criterion Project Execution will be evaluated based on the following sub-sub-criteria and weights: Project Programme: 50 % Organisation and Execution Plan: 50 % Please refer to the Tender Conditions for further information.
- The sub-criterion QHS and Sustainability will be evaluated based on the following sub-sub-criteria and weights: Quality, Health and Safety: 50 % Sustainability: 50 % Please refer to the Tender Conditions for further information.

### Options

- The contract contains the following options: 1) Acquiring a DNP Manager to be located at Site for more than six (6) months. The rate is an all-inclusive rate per month. 2) Additional Performance Guarantee Test conducted by a certified third party as specified in D.08 (Tests) at any given time during commissioning and the Defects Notification Period. 3) Extension of the Defects Notification Period for heat pump(s) to four (4) years from Taking Over. 4) Extra 1,000 m3 CO2 storage capacity including all necessary auxiliaries. 5) Extra CO2 filling station including all necessary auxiliaries. 6) Extra CO2 quality measurement station including all necessary auxiliaries.

### Submission Urls

- https://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=429332&B=

## Description

Kredsløb Holding A/S (on behalf of the Kredsløb Group and hereinafter referred to as the "Employer") hereby invites potential suppliers to participate in the Employer's tender of a contract for the construction of a CO2 liquefaction plant and ancillary carbon storage facilities and truck loading stations. To support Aarhus City Council's goal to lead the way in the green transition and create a CO2 neutral society by 2030, the Employer is planning to establish a carbon capture plant to capture the flue gas from the entire Lisbjerg plant, consisting of four separate plants, three which are used for the processing of collected waste from (mainly) Aarhus, and one which is used for the processing of biomass (mostly straw). The carbon capture project will form a natural and necessary part of the Employer's ordinary activities, which includes production and distribution of electricity and district heating primarily to citizens in Aarhus Municipality. The carbon capture plant will be designed and built to ensure high CO2 absorption efficiency, low energy consumption, and low environmental impact, and is expected to be based on amine technology. The captured CO2 (and potentially CO2 from other sources of in the future) will need to be cooled to a temperature where it becomes liquid for more efficient transportation from the carbon capture plant to its final storage site. This tender covers the tender procedure for a contract for the construction of a CO2 liquefaction plant and ancillary carbon storage facilities and truck loading stations (the "CLP Agreement") in connection with the carbon capture plant in Lisbjerg. Ongoing procurement processes, authority approval processes for other scopes of the carbon capture project, the near-future conclusion of a procurement contract concerning the carbon capture plant, future developments or changes in the Danish Energy Agency's CCS tender, and potential changes to the regulatory framework for carbon capture, transport, and storage, may each affect the tender material, e.g., elements of the scope or the planned time schedule, including the Commencement Date. If necessary due to any such circumstances, the Employer will adjust the tender material and inform the tenderers thereof as soon as practically possible.

## Original notice

https://ted.europa.eu/da/notice/-/detail/312624-2025
