# Fjenneslev Sol PV-Project - EPC Contract - 190 MWp (DC)

- **Source:** TED · `516252-2025`
- **Buyer:** HOFOR Vind A/S
- **Published:** 2025-08-06
- **Deadline:** —
- **Estimated value:** 81,000,000 EUR
- **CPV codes:** 45000000, 09300000, 09330000, 09331000, 09331200, 09332000, 45310000, 45317300, 51111000, 51112000, 51112100, 71310000, 71311000
- **Place-of-performance NUTS:** DK022, DNK
- **Buyer-address NUTS:** —
- **Notice type:** can-standard / 30

## Procedure details

Source lists may span several lots; list positions do not establish relationships.

### Procedure Types

- neg-w-call

### Award Criterion Names

- Project Economics
- Project Terms
- Project Proposal
- Quality Management
- Health and Safety
- Sustainability

### Award Criterion Descriptions

- The Total Evaluated Price is calculated based on the following elements: a) TOTAL COSTS (no. 1.1 – 6.4), cf. “Price List (Main Solution)” b) “Total sum” cf. “Change Order Prices” c) Any capitalization of reservations For further details, please see the Tender Conditions.
- The sub-criterion Project Terms will be evaluated based tenderer's deviations from the EPC and the O&M Agreement contractual documents. For further details, please see the Tender Conditions.
- Where; Technical solution = 60% of 25% Project Organisation and Key Personnel = 25% of 25% Project Programme = 15% of 25% For further details, please see the Tender Conditions.
- For further details, please see the Tender Conditions.
- Where; Low carbon materials and solutions = 40% of 5% Use of Apprentices = 60% of 5% For further details, please see the Tender Conditions.

### Options

- • Prolongation of maintenance of the O&M Contract • Grass and vegetation management • Cleaning of all modules • Thermographic inspection of all modules

## Description

HOFOR is to build a PV-plant at Fjenneslev in Centrale Zealand, Denmark, with the capacity of power of 190 MWp (DC).The PV-plant will be connected through a temporary grid connection expected in Q2/2026 based on Energinet’s (the public transmission operator in Denmark) standard concept for temporary grid connections and later will be transferred to the final grid connection expected in Q2/Q3 2030 at a new Energinet-owned 132 kV substation in the area. The overall Fjenneslev PV-project is divided into the following contracts: 1) Delivery of perimeter fencing and vegetation (OTHER CONTRACT), 2) Delivery and installation of two (2) main transformers for the substation (OTHER CONTRACT), 3) EPC Substation excluding delivery of transformer, including installation of export cable (OTHER CONTRACT), 4) EPC PV plant, including PV panels and Operation & Maintenance agreement (O&M) (THIS TENDER) This tender FJV_SOL-EPC-PV - is for the design, procurement and construction of a photovoltaic power station with a capacity of power of 190 MWp (DC). The tender includes an O&M Contract. The tender will include the following options: • Prolongation of maintenance of the O&M Contract • Grass and vegetation management • Cleaning of all modules • Thermographic inspection of all modules The basis of the contract will be an amended version of the Yellow FIDIC book 2017. The contract(s) is expected to be awarded in June 2025 upon the completion of the tender.

## Award result

- **Published notice total:** 70,148,218 EUR
- **Contract concluded:** 2025-07-17
- **Winner:** Energi Innovation APS (CVR Energi Innovation APS) · value 70,148,218 EUR
Published values may cover multiple lots, options and frameworks; they are not supplier revenue. Unlinked notice summaries do not assign each value or expiry to each winner.

## Original notice

https://ted.europa.eu/da/notice/-/detail/516252-2025