# Competitive procedure with negotiation concerning West Bridge Bearing Refurbishment (WBBR)

- **Source:** TED · `806002-2025`
- **Buyer:** A/S Storebælt
- **Published:** 2025-12-04
- **Deadline:** —
- **Estimated value:** 42,500,000 EUR
- **CPV codes:** 45221119, 44212120, 45221100, 45221110, 45223210, 45223500
- **Place-of-performance NUTS:** DK022, DNK
- **Buyer-address NUTS:** —
- **Notice type:** cn-standard / 16

## Procedure details

Source lists may span several lots; list positions do not establish relationships.

### Procedure Types

- neg-w-call

### Award Criterion Names

- Price
- Solution description
- Organisation and staffing

### Award Criterion Descriptions

- See the Instructions to Tenderers.

### Options

- • Option 1: Fixed bearings o The option concerns replacement/refurbishment of 24 fixed TE19F and TE20F bearings. • Option 2: Bearings at abutments o The option concerns replacement or refurbishment of 8 TE12 bearings at the abutments of the West Bridge, where the conditions are different than over open water. • Option 3: Remaining regular bearings o The option concerns replacement or refurbishment of the remaining 56 bear-ings of type TE19 and TE20.

### Submission Urls

- https://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=444657&B=

## Description

The Contracting Entity calls for the tender for West Bridge Bearing Refurbishment (WBBR). The project involves refurbishment of 188 structural bearings on the West Bridge, which is part of the Great Belt Link in Denmark. The work includes both the provision of newly manufactured bearings (approx. 44) and the renovation of the remaining bearings over a period of maximum 5 years. The project involves two parallel concrete bridges – one for rail and one for road. The bridges have now been in service for well over 25 years and the service life of the PTFE sliding plates in the bearings are now close to the end of expected lifetime. The project comprises of substantial work above open waters and includes the handling of structural bearings with a weight between 5 and 8 tonnes. The work also includes design and manufacturing of temporary structures necessary to carry out the refurbishments, according to a concept developed by the Contractor. The bearings needing renovation will have to be taken to land for refurbishment. Pursuant to section 49 of the Danish Public Procurement Act, the Contracting Entity has further considered whether the Contract can be divided into other lots but has found it most appropriate not to make such a division. It is the Contracting Entity's assessment that dividing the Contract into lots would result in disproportionate administrative burdens, both in relation to the synergies, the tender process and in relation to ongoing contract management, including the ongoing management of the tasks under the Contract.