# Market dialogue concerning upcoming contract on Procurement of a spare submarine cable for the 60 kV submarine cable connection between Sweden and Bornholm (Bornholm cable)

- **Source:** TED · `803074-2025`
- **Buyer:** Energinet Eltransmission A/S
- **Published:** 2025-12-03
- **Deadline:** —
- **Estimated value:** —
- **CPV codes:** 31321000, 31321400, 31321500
- **Place-of-performance NUTS:** DNK
- **Buyer-address NUTS:** —
- **Notice type:** pin-only / 5

## Description

Energinet Eltransmission A/S which is part of the Energinet Group, hereby invites potential market suppliers to take part in a written market dialogue. The aim of this market dialogue is to gain insights, in relation to potential suppliers that would be interested in Energinet Eltransmission's upcoming procurement of a spare submarine cable for the 60 kV submarine cable connection between Sweden and Bornholm (Bornholm cable). The Contract is expected to include the following: - Design, manufacturing and delivery of the spare submarine cable The spare cable must be compatible with the existing 60 kV submarine cable which is a single core cable. In the section below the basic dimensions of the existing cable are outlined - Conductor cross-section: 240 mm2 - Conductor material: Copper - Insulation material: XLPE(Cross-linked Polyethylene) - Screen material: Lead - No. of layers of armour wires: 1 - Diameter of armour wires: 6 mm - Outer diameter of cable: 80 mm - Maximum installation depth: 60 meters Concerning the delivery Energinet would like to explore the options of having the cables delivered on drums or on a turntable. Energinet encourages potential suppliers to express their interest in the market dialogue by responding to the questions listed in Appendix 1 - Response Annex available in the tender platform EU-Supply

## Original notice

https://ted.europa.eu/da/notice/-/detail/803074-2025
