# 25/06123 Procurement of condensers for offshore platform -

- **Source:** TED · `221744-2026`
- **Buyer:** Energinet Eltransmission A/S
- **Published:** 2026-03-31
- **Deadline:** 2026-04-29
- **Estimated value:** 10,000,000 DKK
- **CPV codes:** 42113130, 31711150, 31711151
- **Place-of-performance NUTS:** DK011, DNK
- **Buyer-address NUTS:** —
- **Notice type:** cn-standard / 17

## Procedure details

Source lists may span several lots; list positions do not establish relationships.

### Procedure Types

- open

### Award Criterion Descriptions

- Prices must be stated in the attached Price List and the defined price elements must be completed herein. Prices must be stat-ed exclusive of VAT but inclusive of all other expenses associated with the purchase. cf. the Price List doc. nr. 25/06123-13 Prices must be stated in DKK When evaluating 'Price', the Contracting Authority will evaluate the total cost (for evaluation purpose), cf. the Price List doc. nr. 25/06123-13
- Delivery time As part of the evaluation the tenderer must state the maximum guaranteed delivery time from order till final delivery. Tenderers are required to submit, as a mandatory part of their tender, a delivery time schedule. Delivery times will be calculated from the date on which both the Supplier and the Contracting Authority sign the contract, which is expected to take place on 29th May 2026 It should be noted the guaranteed delivery time stated by the tenderer will be penalized in the contract, cf. section 5 in the Contract Agreement. The evaluation of the sub-criteria “Delivery time” will be based on the stated delivery time as offered by the tenderer. A delivery time of 4–12 weeks results in a score of 10, whereas a delivery time of 19–40 weeks results in a score of 0. In between a delivery time of 12 – 19 weeks point scores will be given based on linear interpolation. For delivery times beyond 40 weeks, will not be taken into consideration, being considered as non-compliant.

### Selection Criterion Descriptions

- The tenderer must confirm the economic ability in the ESPD part IV.B with information from the latest annual report regarding the following economic indicators: 1. Equity (total equity incl. share capital, reserves, revaluation, retained earning etc.) 2. Equity ratio (equity/total assets). This must be stated with two decimals. If the tenderer relies on the capacities of other entities or the tenderer is a group of economic operators the information for the ESPD part IV.B must also be given in a separate ESPD from each of these entities. It is the sole responsibility of the tenderer to secure that the minimum requirements are reached based on consolidation when the tenderer is relying on the capacity of other entities or when the tenderer is a group of economic operators. Minimum requirement to economic and financial standing: Concerning 1: Equity from the latest annual report must, at the time limit for receipt of tenders be at least DKK 3 million Concerning 2: Equity ratio from the latest annual report must, at the time of prequalification, be at least 20 pct. If the equity ratio is between 15 pct. and 20 pct. the tenderer can qualify if Equity exceeds DKK 8 million.
- -

### Documents Urls

- https://www.comdia.com/energinet/tenderinformationshow.aspx?Id=690436

### Submission Urls

- https://www.comdia.com/energinet/tenderinformationshow.aspx?Id=690436

## Description

The Contracting Authority wants to purchase new condenser units for the offshore platforms Kriegers Flak A (KFA) and Kriegers Flak B (KFB). The existing condensers have severe internal corrosion and perforation and must be replaced with units that meet high grade offshore corrosion resistance standards. The value of the contract is expected to amount to DKK 10 million For further details concerning the purchase, reference is made to the tender documents cf. section 1.3

## Original notice

https://ted.europa.eu/da/notice/-/detail/221744-2026
