# EU Tender: Re-Tender for framework agreement concerning Arc Suppression coils - Lot 1 & Lot 2

- **Source:** TED · `400384-2026`
- **Buyer:** N1 A/S
- **Published:** 2026-06-11
- **Deadline:** —
- **Estimated value:** 160,000,000 DKK
- **CPV codes:** 31000000
- **Place-of-performance NUTS:** DK032, DNK
- **Buyer-address NUTS:** —
- **Notice type:** can-standard / 30

## Procedure details

Source lists may span several lots; list positions do not establish relationships.

### Procedure Types

- oth-mult

### Award Criterion Names

- Price
- Quality
- Delivery time
- Environmental Product Declaration
- Agreement terms

### Award Criterion Descriptions

- Lot 1: Tender evaluation with respect to the sub-criterion ‘Price’ for Lot 1 is based on the Tenderer’s response to Annex C.1 – Price Schedule – Lot 1 Arc Suppression Coils 10-20 kV. For the evaluation of “Price”, the total evaluation price, cf. Annex C.1 – Price Schedule – Lot 1 Arc Suppression Coils 10-20 kV, cell M15, forms the basis. Lot 2: Tender evaluation with respect to the sub-criterion ‘Price’ for Lot 1 is based on the Tenderer’s response to Annex C.2 – Price Schedule – Lot 2 Arc Suppression Coils 60 kV. For the evaluation of “Price”, the total evaluation price, cf. Annex C.2 – Price Schedule – Lot 2 Arc Suppression Coils 60 kV, cell M10, forms the basis.
- The Contracting Entity will evaluate the extent to which, and in what qualitative manner, the requirements set out in the Requirement specification are fulfilled, it being assessed positively that the requirements are fulfilled, and assessed negatively if the requirements set out in the specification are not fulfilled. In addition, It will be assessed positively if the Tenderer provides, or undertakes to prepare, an instructional video clearly demonstrating how installation and maintenance of the equipment shall be carried out. The Contracting Entity sets as a minimum requirement that the Tenderer must achieve at least 4 points for the sub-criterion “Quality”. Only tenderers who meet the stipulated minimum score requirement for the qualitative criteria—i.e., at least 4 points for the sub-criterion “Quality”—will participate in the further award procedure. Tenderers who do not meet this minimum requirement will not be considered further in the award of the Framework Agreement.
- Lot 1: The Tenderer shall state the committed delivery time from Purchase Order to delivery at N1 for the Arc Suppression Coils. The Tenderer will be obliged to deliver within the committed delivery time during the duration of the Framework Agreement. Point for delivery time for Lot 1 is allocated based on the table below: Delivery time Points ≤ 8 months 8 > 8 to ≤ 9 months 7 > 9 to ≤ 10 months 6 > 10 to ≤ 11 months 5 > 11 to ≤ 12 months 4 > 12 to ≤ 13 months 3 > 13 to ≤ 14 months 2 > 14 to ≤ 15 months 1 > 15 months 0 The Contracting Entity sets as a minimum requirement that the Tenderer shall offer a delivery time not exceeding sixteen (16) months. Only tenderers who comply with this requirement will participate in the further award procedure. Tenderers who do not comply with this minimum requirement will not be considered further for the award of the Framework Agreement. Lot 2: The Tenderer shall state the committed delivery time from Purchase Order to delivery at N1 for the Arc Suppression Coils. The Tenderer will be obliged to deliver within the committed delivery time during the duration of the Framework Agreement. Point for delivery time for Lot 2 is allocated based on the table below: Delivery time Points ≤ 12 months 8 > 12 to ≤ 13 months 7 > 13 to ≤ 14 months 6 > 14 to ≤ 15 months 5 > 15 to ≤ 16 months 4 > 16 to ≤ 17 months 3 > 17 to ≤ 18 months 2 > 18 to ≤ 19 months 1 > 19 months 0 The Contracting Entity sets as a minimum requirement that the Tenderer shall offer a delivery time not exceeding twenty (20) months. Only tenderers who comply with this requirement will participate in the further award procedure. Tenderers who do not comply with this minimum requirement will not be considered further for the award of the Framework Agreement.
- The Tenderer shall state whether a third-party certified/verified Environmental Product Declaration (EPD) for the arc suppression coil is available in accordance with ISO 14025 and EN 15804, or equivalent standards. If such an EPD is not already available at the time of tender submission, the Tenderer shall specify when an EPD can be delivered for each type Arc Suppression coil. Under the sub-criterion “Environmental Product Declaration (EPD)”, the Contracting Entity will assess the extent to which, and the qualitative manner in which, the Tenderer can deliver EPDs in accordance with ISO 14025 and EN 15804, or equivalent standards for the arc suppression coils. Points for the delivery of a third-party verified EPD is allocated based on the table below: Point 0 There are no plans to develop EPD’s 1 The Contracting Entity will receive a third party verified EPD for the specific type Arc Suppression coil no later than 24 months after the first delivery. 2 The Contracting Entity will receive a third party verified EPD for the specific type Arc Suppression coil no later than 20 months after the first delivery. 3 The Contracting Entity will receive a third party verified EPD for the specific type Arc Suppression coil no later than 16 months after the first delivery. 4 The Contracting Entity will receive a third party verified EPD for the specific type Arc Suppression coil no later than 12 months after the first delivery. 5 The Contracting Entity will receive a third party verified EPD for the specific type Arc Suppression coil no later than 8 months after the first delivery. 6 The Contracting Entity will receive a third party verified EPD for the specific type Arc Suppression coil no later than 4 months after the first delivery. 7 The Contracting Entity will receive a third party verified EPD for the specific type Arc Suppression coil at the first delivery 8 The Contracting Entity will receive a third party verified EPDs for the different types of Arc Suppression coils together with the Tenderers offer
- In assessing the sub-criterion ‘Agreement terms’, emphasis is placed on ensuring that the specified requirements which are not identified as minimum requirements, cf. section 6.5.1, are met; failure by the tenderer to meet these requirements will be assessed negatively. The Contracting Entity sets as a minimum requirement that the Tenderer must achieve at least 4 points for the sub-criterion “Agreement terms”. Only tenderers who meet the stipulated minimum score requirement for the qualitative criteria—i.e., at least 4 points for the sub-criterion “Agreement terms”—will participate in the further award procedure. Tenderers who do not meet this minimum requirement will not be considered further in the award of the Framework Agreement.

## Description

The tender concerns a framework agreeement for Arc Suppression Coils divided into two lots: Lot 1 - Arc Suppression Coils 10-20 kV and Lot 2 - Arc Suppression Coils 60 kV.

## Award result

- **Published notice total:** 160,000,000 DKK
- **Contract concluded:** 2026-05-18
- **Winner:** Hitachi Energy Denmark A/S (CVR 39856638), Hitachi Energy Denmark A/S - Lot (CVR 39856638) · value 160,000,000 DKK
Published values may cover multiple lots, options and frameworks; they are not supplier revenue. Unlinked notice summaries do not assign each value or expiry to each winner.

## Original notice

https://ted.europa.eu/da/notice/-/detail/400384-2026
