UdbudsScanner
Alle udbud
TED7768-2024

Tender of a contract regarding flue gas condensation and heat pump unit line 5

Ordregiver
I/S Vestforbrænding
Værdi
120.000.000 DKK
Frist
Publiceret
5.1.2024
CPV
45252000, 45251250, 45252300
NUTS
DK012, DNK
Beskrivelse
I/S Vestforbrænding had initiated this procedure to engage a contractor for the engineering, installation, and commissioning of the combined flue gas condenser and heat pump unit for boiler line 5 to be located at Vestforbrænding, Ejby Mosevej 219, 2600 Glostrup, Denmark, as a part of a carbon capture project. The combined flue gas condenser and heat pump unit will be implemented to guarantee that the flue gas temperature does not exceed 30 °C at the flue gas condensation outlet before entering a future carbon capture plant. The existing flue gas condenser and absorption heat pump must be decommissioned. On the cold side, the heat pump unit will be cooling an intermediate circuit, while on the hot side, it will be preheating district heating water before entering the turbine condensers. The scope of the contract comprises detailed design, delivery, installation, testing, and commissioning of a complete flue gas condenser unit combined with a heat pump unit for boiler line 5.