TED179553-2024

Framework Agreement for gas compressor packages

Ordregiver
Energinet
Oplyst værdi / estimat
Frist
Publiceret
26.3.2024
Leveringssted (NUTS)
DNK

Dataposten opdateret . Datakilder, dækning og beregningsmetode.

Beskrivelse
The Framework Agreement covers installation of a number of reverse-flow plants with compressors for moving upgraded biogas from the distribution grid into the 80 barg natural gas transmission grid in Denmark. The compressor packages will have different requirements to capacity range as well as pressure range. Basically, the units shall cover the capacity range from 5.000 Nm3/hr., to 15.000 Nm3/hr., with a min. inlet pressure of either 12, 23 or 35 barg and an approximate max. outlet pressure of either 60 or 80 barg. A larger unit is included, with a capacity of 30.000 Nm3/hr., at an inlet pressure of 23 barg and outlet of 80 barg. The overview of the data of the compressor units can be found in Appendix 3: Schedule of Prices. The compressors shall be delivered as packaged units (skid mounted) units. In addition to the supply of compressor packages the scope also includes Service and Maintenance Agreement. For further details concerning the purchase, reference is made to the appendices to the tender documents.

Procedure og udbudsmateriale

Oplysninger fra bekendtgørelsen kan dække flere delkontrakter. Listerne nedenfor er separate uddrag; rækkefølgen kobler ikke et kriterium til en beskrivelse eller delkontrakt. Kontrollér krav, vægtning, frister, optioner og eventuelle rettelser i originalmaterialet.

Proceduretype (kildens kode)

  • neg-w-call

Andre bekendtgørelser i samme CPV-kategori

Nyeste bekendtgørelser med samme firecifrede CPV-kategori. Listen kan omfatte både åbne udbud og historik.