TED163918-2024
Market dialogue - Framework agreement for emergency repairs and planned repairs of the land and submarine cables of the COBRAcable interconnector
- Ordregiver
- Energinet Eltransmission A/S
- Oplyst værdi / estimat
- —
- Frist
- —
- Publiceret
- 19.3.2024
- Leveringssted (NUTS)
- DNK, DEU
Dataposten opdateret . Datakilder, dækning og beregningsmetode.
Beskrivelse
Energinet would like to identify potential suppliers for a framework agreement for emergency repairs and planned repairs of the land and submarine cables of the COBRAcable interconnector between Denmark and the Netherlands. The scope of the framework agreement is jointing works and delivery of spare parts in relation to emergency and planned repairs of the land and submarine cables of the COBRAcable interconnector. LOT 1 - COBRAcable – Cable repair - Onshore Place of Performance: DK-Denmark Energinet would like to enter into a framework agreement for emergency repairs and planned repairs of the land cable of the COBRAcable interconnector and would therefore like to identify suppliers for such an agreement. The COBRAcable interconnector connects the electricity transmission grids in Denmark(DK2) and the Netherlands and is capable of transmitting 700 MW at +/- 320 kV DC. The interconnector was commissioned in 2019. The land cable was manufactured by Prysmian and the insulation material of the land cable is DC XLPE. Expected contract value: 5 million EUR The scope of works for this framework agreement - Jointing works in relation to emergency repairs and planned repairs of the COBRAcable land cable - Delivery of spare sparts(such as land cable joints, transition joints between land and submarine cable, cable end terminations etc.) With this announcement Energinet would like to identify potential suppliers who have an interest in submitting a bid for the services tendered for in a tender and subsequently undertake the services outlined above. Energinet will contact the suppliers who have shown an interest in submitting a bid and reserves the right to clarify if the supplier can deliver the services tendered for. LOT 2 - COBRAcable – Cable repair - Offshore Place of Performance: DK-Denmark and DE - Germany Energinet would like to enter into a framework agreement for emergency repairs and planned repairs of the submarine cable of the COBRAcable interconnector and would therefore like to identify suppliers for such an agreement. The COBRAcable interconnector connects the electricity transmission grids in Denmark(DK2) and the Netherlands and is capable of transmitting 700 MW at +/- 320 kV DC. The interconnector was commissioned in 2019. The submarine cable was manufactured by Prysmian and the insulation material of the submarine cable is DC XLPE. Expected contract value: 5 milion EUR The scope of works for this framework agreement - Jointing works in relation to Emergency repairs and planned repairs of the COBRAcable submarine cable - Delivery of spare sparts(such as submarine cable joints, transition joints between land and submarine cable etc.) With this announcement Energinet would like to identify potential suppliers who have an interest in submitting a bid for the services tendered for in a tender and subsequently undertake the services outlined above. Energinet will contact the suppliers who have shown an interest in submitting a bid and reserves the right to clarify if the supplier can deliver the services tendered for.
Andre bekendtgørelser i samme CPV-kategori
Nyeste bekendtgørelser med samme firecifrede CPV-kategori. Listen kan omfatte både åbne udbud og historik.
- Haveridokning og reparation af ESBERN SNARE
Forsvarsministeriets Materiel- og Indkøbsstyrelse
- VCS-NextG
Naviair
- Serviceaftalen vedrørende service på flow-core maskiner produceret af Becton Dickinson Biosciences
Danmarks Tekniske Universitet - DTU
- Håndværkerydelser - AlmenIndkøb
Almenindkøb
- Tender for contract regarding the supply, delivery and installation of two (2) high volume air samplers for airborne nuclide measurement and nuclear surveillance, including sustainment services.
Danish Ministry of Defence Acquisition and Logistics Organisation
- Rammeaftale på luftledningsmontage
Energinet Eltransmission A/S