TED143802-2024
Signalling system for the Fjernbane East
- Ordregiver
- Banedanmark
- Værdi
- —
- Frist
- —
- Publiceret
- 8.3.2024
- CPV
- 51100000, 34632200, 34632000, 34632300, 48140000, 50220000, 45234115, 34942000, 31321700, 34943000, 45316200
- NUTS
- DK013, DK021, DK022, DK011, DK012, DK031, DNK
Tildeling
CVR 17184210CVR BE0436195241CVR IT02791070044
Beskrivelse
The delivery conducted on the Fjernbane Infrastructure East Contract is based on a Change Over System (COS) migration strategy. The COS migration strategy is by this modification replaced with a No-Change Over System (No-COS) migration strategy for the roll-out lines RO 2, 3, 4, 5, 7N and 9. The COS migration strategy requires intermediate equipment and an interface to the existing legacy systems to sustain and continue the ongoing train operation during migration. After commissioning of the new signaling system, this temporary equipment is required to be removed which entails further track closures. The No-COS migration strategy does not require intermediate equipment and interfaces to the existing legacy systems, as the migration is conducted directly to the new signaling system and there are thus also no additional tasks after migration. The No-COS migration strategy also implies that a larger portion of the testing is done in a test environment instead of in traffic. As a consequence of the modification the following deliveries are removed from the contract: 1) Temporary signaling for migration e.g. COS Box (hardware, installation & decommissioning), 2) Safety packages that are not necessary for the No-COS migration strategy - No-COS migration is done around the commissioning and only once instead of twice using COS, 3) Descope of the following resources needed for installation and decommissioning of temporary equipment: Migration Manager, Site Managers, Clamper, Engineer, Test and Commissioning Manager, Safety Manager. As a consequence of the modification the following deliveries are added to the contract regarding Test & Test environment: 1) A Factory Integration and Validation Platform (FIVP), 2) Increased test automation for functional tests, 3) Enhancement to existing Test Control tool (Venus) and development of new tools to automatically run endurance tests simulating train runs, 4) Analysis tool update, 5) Increased test coverage with data directly coming from production, and 6) Update of Joint Test Laboratory (JTL) with further test procedures. As a consequence of the modification the following deliveries are also added to the contract regarding Resources and equipment: 1) Increased capacity of the following resources needed to do No-COS migration: Migration Manager, Site Manager, Clamper, Engineer, Test & Commissioning Manager, Safety Manager and 2) Physical equipment needed to do installation of a short-term transition zone: 6 Marker Boards and 24 Balises.