Gå til hovedindhold
UdbudsScanner
Alle udbud
TED419885-2024

New Sorting Facility

Oplyst værdi / estimat
160.000.000 DKK
Frist
Publiceret
12.7.2024
Leveringssted (NUTS)
DK011, DNK

Dataposten opdateret . Datakilder, dækning og beregningsmetode.

Beskrivelse
This procurement procedure regards a contract for the establishment of a new sorting plant for I/S Amager Ressourcecenter ("ARC"). The new sorting plant is to be located next to ARC's existing Waste-to-Energy facility in Copenhagen, Denmark. The purpose of the new sorting plant is to sort residual MSW from source segregated waste from households in Copenhagen. The contract includes design and construction of the new sorting plant on a turnkey basis. The works included in the contract are described more thoroughly in the procurement documents, in particular Part III. ARC has decided not to divide the contract regarding the establishment of a new sorting plant into lots as ARC consider the content of this contract the optimal solution for ARC’s needs, i.a. regarding synergies, interfaces to other contractors and contractor liability.

Procedure og udbudsmateriale

Oplysninger fra bekendtgørelsen kan dække flere delkontrakter. Listerne nedenfor er separate uddrag; rækkefølgen kobler ikke et kriterium til en beskrivelse eller delkontrakt. Kontrollér krav, vægtning, frister, optioner og eventuelle rettelser i originalmaterialet.

Proceduretype (kildens kode)

  • neg-w-call

Tildelingskriterier

  • Price
  • Technical Solution
  • Project Execution

Beskrivelser af tildelingskriterier

  • The evaluation of the sub-criterion "Price" will be carried out in accordance with section 6.2.1 of the Tender Conditions.
  • The evaluation of the sub-criterion "Technical Solution" will be carried out in accordance with section 6.2.2 of the Tender Conditions.
  • The evaluation of the sub-criterion "Project Execution" will be carried out in accordance with section 6.2.3 of the Tender Conditions.

Oplyste optioner

  • The contract includes the following options: • Second recovery step for mixed plastic and tetra (“Option 1") • Cleaner for mixed plastic (“Option 2") • Cleaner for paper and tetra (“Option 3”) • Fire detection and fighting equipment (“Option 4") If ARC wishes to exercise one or more of the options, ARC must inform the Contractor thereof no later than 6 months after both ARC and the Contractor have signed the contract. The options included in the contract are described more thoroughly in Part III, Appendix A14 (Options). In addition to the four options listed above, the contract includes the contractor’s performance of additional work/variants (including additional travels) to the extent ARC finds it necessary to complete the new sorting plant.

Aflevering af tilbud

Andre bekendtgørelser i samme CPV-kategori

Nyeste bekendtgørelser med samme firecifrede CPV-kategori. Listen kan omfatte både åbne udbud og historik.