TED633626-2024

Fjernvarme Fyn Carbon Capture plant

Oplyst værdi / estimat
Frist
Publiceret
18.10.2024
Leveringssted (NUTS)
DK031, DNK

Dataposten opdateret . Datakilder, dækning og beregningsmetode.

Beskrivelse
Fjernvarme Fyn is planning to reduce the carbon footprint from the waste to energy plant in Odense, Denmark.   The tender will include an EPC contract for the entire Carbon capture plant. (Excluded Building and construction) The intention is to tender openly to the various technical solutions for technology in the capturing of CO2. Fjernvarme Fyn emits appx. 325 thousand tons of CO2 per year. 50% of the CO2 is biogenic and 50% is fossil. The CO2 is foreseen to be liquified in the carbon capture plant before transportation to an intermediate storage. The tender for the CO2 plant is expected to include carbon capture facilities, storage tanks, waste heat recovery, liquifaction- and loading facilities.  Main figures for the waste to energy plant: - Incinerator 11 & 12: 2 x ~8,5 t/h, build 1995 - Incinerator 13: ~17 t/h, build 2000 - Waste: 300.000 t/y, ~50% fossil and ~50% biogenic - Power: 20 MW - Heat: 105 MJ/s

Procedure og udbudsmateriale

Oplysninger fra bekendtgørelsen kan dække flere delkontrakter. Listerne nedenfor er separate uddrag; rækkefølgen kobler ikke et kriterium til en beskrivelse eller delkontrakt. Kontrollér krav, vægtning, frister, optioner og eventuelle rettelser i originalmaterialet.

Proceduretype (kildens kode)

  • comp-dial

Beskrivelser af tildelingskriterier

  • Pris

Andre bekendtgørelser i samme CPV-kategori

Nyeste bekendtgørelser med samme firecifrede CPV-kategori. Listen kan omfatte både åbne udbud og historik.