Silkeborg Varme - Major Overhaul of GE Gas Turbines

Oplyst værdi / estimat
4.000.000 EUR
Frist
Publiceret
19.12.2024
Leveringssted (NUTS)
DK042, DNK

Dataposten opdateret . Datakilder, dækning og beregningsmetode.

Beskrivelse
SV is planning for a major overhaul of the 40 MW GE gas turbine at the CHP plant in Silkeborg. The turbine was commissioned in 1995. To ensure reliable, safe, and efficient operation of the unit a major overhaul of the Gas turbine is needed.

Procedure og udbudsmateriale

Oplysninger fra bekendtgørelsen kan dække flere delkontrakter. Listerne nedenfor er separate uddrag; rækkefølgen kobler ikke et kriterium til en beskrivelse eller delkontrakt. Kontrollér krav, vægtning, frister, optioner og eventuelle rettelser i originalmaterialet.

Proceduretype (kildens kode)

  • neg-w-call

Tildelingskriterier

  • Price
  • Execution
  • Time schedule

Beskrivelser af tildelingskriterier

  • The evaluation of the sub-criterion "Price" will be based on the prices stated by the tenderer in the Price List (Appendix A), in the schedule of hourly and/or daily rates of the tenderers (rates for extra works (variations)) and in Appendix E.
  • "Execution" is evaluated solely on the specific requirements and guidelines described in the procurement material.
  • "Time schedule" is evaluated solely on the specific requirements and guidelines described in the procurement material.

Oplyste optioner

  • 4. Options 4.1 Overhaul of Stage 8 Valve 4.2 Overhaul of CDP Valve 4.3 Replacement of Global Shut-off Valves 4.4 Replacement of FOD Sock 4.5 General overhaul of Engine Mounts 4.6 Low Pressure Compressor Rotor (LPCR) 4.6.a Replacement blade of new material, unit price 4.6.b Replacement blade of refurbished material, unit price 4.7 Low Pressure Compressor Stators (LPCS) 4.7.a Replacement vane of new material, unit price 4.7.b Replacement vane of refurbished material, unit price 4.8 High-Pressure Compressor Rotor (HPCR) 4.8.a Replacement blade of new material, unit price 4.8.b Replacement blade of refurbished material, unit price 4.9 High-Pressure Compressor Stator (HPCS) 4.9.a Replacement vane of new material, unit price 4.9.b Replacement vane of refurbished material, unit price 4.10 Stage 1 High-Pressure Turbine Nozzle Assembly (S1 HPTN) 4.10.a Replacement nozzle segment of new material, unit price 4.10.b Replacement nozzle segment of refurbished material, unit price 4.11 Stage 2 High-Pressure Turbine Nozzle Assembly (S2 HPTN) 4.11.a Replacement nozzle segment of new material, unit price 4.11.b Replacement nozzle segment of refurbished material, unit price 4.11.c Replacement shrouds of new material, unit price 4.11.d Replacement shrouds of refurbished material, unit price 4.12 High-Pressure Turbine Rotor Assembly (HPTR) 4.12.a Stage 1 replacement blade of new material, unit price 4.12.b Stage 1 replacement blade of refurbished material, unit price 4.12.c Stage 2 replacement blade of new material, unit price 4.12.d Stage 2 replacement blade of refurbished material, unit price 4.13 Low-Pressure Turbine Rotor (LPTR) 4.13.a Replacement blade of new material, unit price 4.13.b Replacement blade of refurbished material, unit price 4.14 Low-Pressure Turbine Stator Case (LPTS) 4.14.a Replacement nozzle segment of new material, unit price 4.14.b Replacement nozzle segment of refurbished material, unit price