UdbudsScanner
Alle udbud
TED464540-2025

Public procurement regarding UNICEF Campus 4 – MHE (Material Handling Equipment)

Ordregiver
Udviklingsselskabet By & Havn I/S
Værdi
900.000.000 DKK
Frist
Publiceret
16.7.2025
CPV
45000000, 42417000, 71000000
NUTS
DK011, DNK
Tildeling
Samlet værdi: 752.543.191 DKKKontrakt indgået: 15.7.2025
CVR 05856366752.543.191 DKK1 bud modtaget
Beskrivelse
By & Havn has entered into a contract regarding the delivery of Material Handling Equipment for UNICEF Campus 4. The project UNICEF Campus 4 comprises the construction of a new distribution centre to replace UNICEF's existing facilities at Oceanvej in Nordhavn, Copenhagen. In general, UNICEF Campus 4 consists of the following facilities divided as follows between the MHE Contractor (MHC) and a design and build construction contractor (“Design and Build Contractor”) (the last mentioned is a separate tender): • Material Handling Equipment (MHE) (the contract covered by this notice): The MHC shall perform the full material handling solution, including the two high-bay warehouses, automation in the backbone and in the low-bay warehouse all supported by an integrated WMS. MHC shall also provide a clack-rack solution for the two high-bay warehouses. • Design and build construction (BYG/CWC): The Design and Build Contractor shall perform the construction of the administration building (headquarters), a low-bay warehouse with associated administration, backbone building and sprinkler reservoir, electrical building and other minor buildings, and base slabs for the two high-bay warehouses. The MHE Contract concerns the delivery of the complete planning, coordination, manufacturing, delivery and unloading on site, ingress and positioning, installation/erection, training and training materials, testing, commissioning, documentation materials/manuals, and remedying of any defects therein, of the complete MHE delivery (the Works). The MHE Contract is based on a set of Particular Conditions to FIDIC Yellow Book – Conditions of Contract for Plant & Design Build - Second Edition 2017 (document ID 2302) (reprinted 2022 with amendments). The MHE Contract will be carried out in the period August 2025 – May 2029 and a period from December 2028 – December 2038 as regards the service and maintenance agreement (“Service and Support Agreement”). The Service and Support Agreement can be extended by By & Havn.