Gå til hovedindhold
UdbudsScanner
Alle udbud
TED552618-2025

Supercapasitor modules

Oplyst værdi / estimat
Frist
10.9.2025
Publiceret
25.8.2025
Leveringssted (NUTS)
DK050, DNK

Dataposten opdateret . Datakilder, dækning og beregningsmetode.

Beskrivelse
Aalborg University - AAU Energy is set to create a new hybrid Energy Storage (HES) facility representing a pioneering advancement in scalable, controllable, modular, and flexible energy storage solutions. This cutting-edge facility addresses critical challenges in grid stability, power quality management, and future renewable energy integration while providing essential grid balancing services. The HES facility integrates storage technologies, including Supercapacitors and Battery modules, coupled with Power Electronic interfaces, a Real-Time Digital Simulator, and a Linear Power Amplifier. Operating at a 750-kW capacity level, the facility is designed to: •Stabilize power demand fluctuations from renewable energy sources •Enable both grid-connected and islanded operational modes •Support energy services and power system-level applications The Contracting Authority puts out to announcement the purchase of Supercapacitor Modules.

Procedure og udbudsmateriale

Oplysninger fra bekendtgørelsen kan dække flere delkontrakter. Listerne nedenfor er separate uddrag; rækkefølgen kobler ikke et kriterium til en beskrivelse eller delkontrakt. Kontrollér krav, vægtning, frister, optioner og eventuelle rettelser i originalmaterialet.

Proceduretype (kildens kode)

  • oth-single

Tildelingskriterier

  • Prince
  • Quality

Beskrivelser af tildelingskriterier

  • Se tender specification, section 4.1

Aflevering af tilbud

Andre bekendtgørelser i samme CPV-kategori

Nyeste bekendtgørelser med samme firecifrede CPV-kategori. Listen kan omfatte både åbne udbud og historik.