TED693469-2025

AVV Square 2.0 - Battery Energy Storage System (BESS)

Oplyst værdi / estimat
11.350.000 EUR
Frist
Publiceret
21.10.2025
Leveringssted (NUTS)
DK012, DNK

Dataposten opdateret . Datakilder, dækning og beregningsmetode.

Tildeling

Vinderlisten dækker bekendtgørelsen. Denne visning har ikke en sikker kobling mellem hver vinder, delkontrakt, værdi og udløbsdato. Se originalen for fordelingen.

Bekendtgørelsens samlede værdi: 11.350.000 EURKontrakt indgået: 15.10.2025
CVR 32270433Oplyst værdi: 11.350.000 EUR

Beløb er offentliggjorte værdier i bekendtgørelser og kan omfatte flere delkontrakter, rammeaftalelofter og estimater. De viser ikke faktisk omsætning eller forbrug. Valutaer summeres hver for sig uden omregning. Manglende beløb er ikke nul. Se datagrundlag og metode.

Beskrivelse
The Battery Energy Storage System (BESS) is to be installed within the perimeters of the power station Avedøreværket, located in Avedøre (Hammerholmen 50, 2650 Hvidovre), Denmark. The BESS will be sized for aminimum of 20 MW usable capacity capable of operating for approx. 2 hours at nameplate rating. The purpose of the BESS is to provide the ancillary services FCR-N (“Frequency Containment Reserve for Normal operations”), FCR-D (“Frequency Containment Reserve for Disturbances”) and FFR (“Fast Frequency Response”), aFRR and mFRR (“automatic/manual Frequency Restoration Reserve”) for participation in the regulation of the electrical transmissionsystem DK2 that is within responsibility of the Transmission System Operator (TSO) Energinet Elsystemansvar A/S. The Contract comprises the following: (a) Delivery of the BESS consisting of Battery bank, Inverter system, BESS transformer, Medium voltage (MV) interface to the interconnection cables, DC and AC switch-boards, HVA/C and fire controlsystem, LV and MV cabling (internally within the BESS, but not between BESS equipment units), housing forcomponents, Energy Management System (EMS), Metering system, and Frequency measurement device, (b) Installation and commissioning of the BESS at the power station Avedøreværket, located in Avedøre (Hammerholmen 50, 2650 Hvidovre), Denmark, (c) Service and Maintenance Agreement including consumables and spare parts for 2 years operation, (d) First extension of the Service and Maintenance Agreement for additional 4 years including consumablesand spare parts (years 3 to 6 – optional for the Contracting Entity) (e) Second extension of the Service and Maintenance Agreement for additional 4 years including consumables and spare parts (years 7 to 10 – optional for the Contracting Entity) (f) A water-based sprinkler system (optional for the Contracting Entity) (g) Drainage inside the housing forcomponents to handle contaminated fire water (optional for the Contracting Entity).

Procedure og udbudsmateriale

Oplysninger fra bekendtgørelsen kan dække flere delkontrakter. Listerne nedenfor er separate uddrag; rækkefølgen kobler ikke et kriterium til en beskrivelse eller delkontrakt. Kontrollér krav, vægtning, frister, optioner og eventuelle rettelser i originalmaterialet.

Proceduretype (kildens kode)

  • neg-w-call

Oplyste optioner

  • Extension of the Service and Maintenance Agreement including consumables and spareparts, a water-based sprinkler system, drainage inside the housing for components to handle contaminated fire water