KFST813-1
Danmark-Fredericia: Offshoreaktiviteter
- Oplyst værdi / estimat
- —
- Frist
- —
- Publiceret
- 8.11.2017
- CPV
- 76520000
- Leveringssted (NUTS)
- Ikke oplyst
- Ordregivers adresseområde (NUTS)
- DK03
Dataposten opdateret . Datakilder, dækning og beregningsmetode.
Beskrivelse
The tendered assignment includes the provision of client representative services in relation to UXO risk mitigation activities with scheduled duration from March 2018 and to June 2019. The UXO risk mitigation activities include UXO survey, Inspection of possibly buried targets (ROV and sub-sea excavation) and possibly removal of verified UXO items. The tendered assignment shall be provided to the project Viking Link developed jointly between Energinet (Denmark) and National Grid (United Kingdom).
Andre bekendtgørelser i samme CPV-kategori
Nyeste bekendtgørelser med samme firecifrede CPV-kategori. Listen kan omfatte både åbne udbud og historik.
- Supplier qualification system for 525 kV HVDC power cables and installation
Energinet Eltransmission A/S
- Kvalifikationsordning for Maritimt arbejde
Nexel A/S
- Installation of submarine cable for project HAT-RYT
Energinet Eltransmission A/S
- Kvalifikationsordning for Maritimt arbejde
Nexel A/S
- Tender under SQS 343701 "525 kV HVDC power cables and installation" - 525 kV HVDC underground and submarine power cables incl. offshore installation, Bornholm Energy Island (Danish part)
Energinet Eltransmission A/S
- Kvalifikationsordning for Maritimt arbejde
Nexel A/S