KFST2709-1
Danmark-Esbjerg: Bygge- og anlægsarbejde i forbindelse med kraftværker, mineanlæg og fremstillingsvirksomheder samt bygninger i tilknytning til olie- og gasindustrien
- Oplyst værdi / estimat
- —
- Frist
- 20.10.2017
- Publiceret
- 22.9.2017
- CPV
- 45250000
- Leveringssted (NUTS)
- Ikke oplyst
- Ordregivers adresseområde (NUTS)
- DK03
Dataposten opdateret . Datakilder, dækning og beregningsmetode.
Beskrivelse
Supply of all required work for the Transition Pieces Manufacturing corresponding to the requirements specified by the contracting entities.Vattenfall has been awarded the concession for the Danish offshore wind project Vesterhav Nord and Vesterhav Syd, Danish Kriegers Flak, led by the Danish Energy Agency [DEA].The wind farms will consist out of monopile foundations including transition pieces connected by bolted flange connection, wind turbine generators of equal or more than 8 MW and inter array cable with the following number of locations::— Danish Kriegers Flak: up to 75 locations.— Vesterhav Nord: up to 25 locations.— Vesterhav Syd: up to 25 locations.
Andre bekendtgørelser i samme CPV-kategori
Nyeste bekendtgørelser med samme firecifrede CPV-kategori. Listen kan omfatte både åbne udbud og historik.
- EU-udbud vedr. etablering af MABR (Membrane Aerated Biofilm Reactor) anlæg på NØ Renseanlæg til VandCenter Syd A/S
SAMAQUA A/S
- Etablering af akkumuleringstank
Auning Varmeværk a.m.b.a
- Technical Water Treatment Plant
DIN Forsyning Teknisk Vand A/S
- Hinnerup Fjernvarme - 16 MW Elkedelanlæg
Hinnerup Fjernvarme
- Udførelse af teknik (maskin) ifm. etablering af tilslutningsanlæg 725
Kredsløb Transmission A/S
- Bygherrerådgivning
Lyngby Taarbæk Forsyning