KFST5635-1
Danmark-Esbjerg: Anlæg af vej
- Ordregiver
- Vattenfall Vindkraft A/S
- Oplyst værdi / estimat
- —
- Frist
- 9.8.2019
- Publiceret
- 9.7.2019
- Leveringssted (NUTS)
- Ikke oplyst
- Ordregivers adresseområde (NUTS)
- DK03
Dataposten opdateret . Datakilder, dækning og beregningsmetode.
Beskrivelse
Construction of infrastructure for wind turbines at Nørre Økse SøThe site is an area of reasonably flat, open farmland.New roads along the existing farm land boundaries must be constructed, so the individual wind turbine locations can be accessed by construction equipment and the turbine components. The road layout is designed based on geotechnical survey and according to the requirement of the turbine supplier. For the erection and maintenance requirements at each wind turbine location a hardstand area in region of 1 500 m2 will be required. For the new roads and hardstands there must be relocated existing field drainage and installed new drainage.The current layout includes 7 ditch crossings, which will require piping that allows water to flow beneath the road.
Andre bekendtgørelser i samme CPV-kategori
Nyeste bekendtgørelser med samme firecifrede CPV-kategori. Listen kan omfatte både åbne udbud og historik.
- Miniudbud af aftale om fortætningsplan – Område 0.99.01
I/S Vestforbrænding og datterselskaber
- Levering og etablering af 15 MW fliskedelanlæg
Brande Fjernvarme A.m.b.a.
- Rammeaftale om etablering af stikledninger (flyverstik)
I/S Vestforbrænding og datterselskaber
- Oprettelse af et dynamisk indkøbssystem til foringer på regn- og spildevandsrør hos Novafos A/S
NOVAFOS A/S
- Fjernvarmeforsyning af Båring og Asperup
Middelfart Fjernvarme a.m.b.a.
- Levering og installation af 50kV højspændingsudstyr til energicentral
I/S Vestforbrænding og datterselskaber