TED617330-2026

Technical Water Treatment Plant

Oplyst værdi / estimat
45.000.000 EUR
Frist
Publiceret
8.9.2026
Leveringssted (NUTS)
DK032, DNK
Ordregivers adresseområde (NUTS)
DK032

Dataposten opdateret . Datakilder, dækning og beregningsmetode.

Tildeling

Vinderlisten dækker bekendtgørelsen. Denne visning har ikke en sikker kobling mellem hver vinder, delkontrakt, værdi og udløbsdato. Se originalen for fordelingen.

Bekendtgørelsens samlede værdi: 45.000.000 EUR
Vinder ikke oplyst
Oplyst værdi: 45.000.000 EUR

Beløb er offentliggjorte værdier i bekendtgørelser og kan omfatte flere delkontrakter, rammeaftalelofter og estimater. De viser ikke faktisk omsætning eller forbrug. Valutaer summeres hver for sig uden omregning. Manglende beløb er ikke nul. Se datagrundlag og metode.

Beskrivelse
This contract notice apply to DIN Forsyning Teknisk Vand A/S' cancellation of the procurement of Technical Water Treatment Plant. Technical Water Treatment Plant is a facility that cleans purified wastewater for use in Power-to-X facilities. In Denmark, the declared goal by 2030 of reducing CO2 emissions by 70% to combat climate change has led to an ambitious plan for Power-to-X, i.e. converting green renewable electricity into fuels (and more) for use in the hard-to-abate sectors, such as the industry, heavy transport, aviation, and shipping transport. DIN Forsyning Teknisk Vand A/S cooperates with companies that want to buy significant quantities of technical water. Technical water is a general term for water that has a different quality than drinking water. The technical water will have a quality as demineralized water. The procurement comprised the complete delivery of a combined plant consisting of: Pure Water Treatment Plant; Reject Water Treatment Plant; buildings; and high voltage installations. The plant is called Technical Water Treatment Plant (TWTP). The TWTP will be located on Mådevej, 6700 Esbjerg. The TWTP must be designed to operate continuously, 24 hours a day, 7 days a week, and 52 weeks a year. The project will be divided in two phases; Phase 1 and Phase 2. Phase 2 is included as an option. The initial phase (Phase 1) will support approximately half of the total capacity. Project capacity: Phase 1 must have a capacity of 230 m³/h output. Phase 2 (option) must have a capacity of 230 m³/h output. The project including the optional Phase 2 must have a capacity of 460 m3/h output. This project also includes a contract for underground piping which is offered in another procurement. DIN Forsyning Teknisk Vand A/S has chosen not to divide the project/contracts further. DIN Forsyning Teknisk Vand A/S has assessed that handling interfaces, responsibilities and risks in particular the contract for TWTP is best placed with the contractor. Further division of the project /contracts will entail increased risk for DIN Forsyning Teknisk Vand A/S, as well as increased costs for construction management etc., which is why DIN Forsyning Teknisk Vand A/S has found it appropriate not to divide the project/contracts further.

Procedure og udbudsmateriale

Oplysninger fra bekendtgørelsen kan dække flere delkontrakter. Listerne nedenfor er separate uddrag; rækkefølgen kobler ikke et kriterium til en beskrivelse eller delkontrakt. Kontrollér krav, vægtning, frister, optioner og eventuelle rettelser i originalmaterialet.

Proceduretype (kildens kode)

  • neg-w-call

Tildelingskriterier

  • Price
  • Quality
  • Organization and qualification
  • Process and collaboration

Beskrivelser af tildelingskriterier

  • Total price incl. options (CAPEX) (25%) When evaluating the total price incl. options (CAPEX), emphasis is placed on the following: - The total price incl. options (CAPEX). Emphasis is placed on prices being as low as possible. Total operating costs (OPEX) (15%) When evaluating the total operating costs (OPEX), emphasis is places on the following: - The total operating costs incl. service agreement (OPEX). Emphasis is placed on operating costs being as low as possible. If the tenderer's performance guarantee is conditional on DIN Forsyning Teknisk Vand A/S entering into a service agreement with the tenderer, costs for this service agreement will be added to the price (CAPEX).
  • When evaluating quality, positive emphasis is placed on the extent to which the tenderer manages to demonstrate the following: That efficient (minimal) operation and maintenance including fully automatic control and good and clear display of on-line measurements are envisaged. An effectful overview of the expected replacements and maintenance, as listed in Contract document 9a Consumption, of the TWTP in the period from year 11 to 30. That process facilities incl. pipe systems, bearings, tanks, etc. as a unified unit appears robust with consistent high quality in all solutions. Proven solutions that are well thought out in relation to DIN Forsyning Teknisk Vand A/S' functional requirements stated in the contract documents. A strong focus on the future operation and maintenance of the plant in relation to the working environment and safety, including access conditions, operation and servicing.
  • When evaluating organization and qualification, positive emphasis is placed on the following: The extent to which the tenderer manages to demonstrate a resilient and robust organization, which shows a clear distribution of roles, responsibilities and powers throughout the project, which supports DIN Forsyning Teknisk Vand A/S in the best way, as described in the procurement documents. It is also considered positive, if the tenderer shows an organization that also can handle operations, technological development and the capacity to be innovative. The extent to which the key employees who are part of the organizational plan have relevant education, skills/qualification and experience in relation to the role the individual employee is intended for in the organization/project and that these are being utilized in the organization. Particular attention is paid to the following key employes: o Project manager (primary contact person for the Employer) o Assistant project manager o Process engineer o Mechanical engineer o Controls engineer o Architect o Construction manager o Commissioning manager o Service manager
  • When evaluating process and collaboration, positive emphasis is placed on the following: The extent to which the tenderer demonstrates and shows knowledge of and understanding to enter into a collaboration on the execution of a project with several professional areas such as designing, building and installing, including in particular: o Involvement of relevant skills/qualifications and stakeholders in the project with focus on broad collaboration. o Demonstrating the ability to work well in teams, share credit, and take responsibility for mistakes. o Showing commitment and willingness to go the extra mile to achieve results. o Communicating effectively and demonstrating a clear Employer (DIN Forsyning Teknisk Vand A/S) and service oriented approach and a good feedback culture. The extent to which the tenderer demonstrates management of the project, where all relevant parties are involved and where there is a focus on contract management among all parties, including in particular: o Ensuring all team members are involved and valued. o Proactively managing and optimization resources and schedules. o Identifying, analyzing and managing risks. o Identifying and incorporating sustainable initiatives. o Ensuring a good transition to operation with a focus on quality assurance, the commissioning process and training. The extent to which the tenderer convincingly demonstrates how the tenderer identifies the biggest challenges in this project in a targeted and controlled manner and in particular how the tenderer proposes to handle the challenges. It is considered positive that the tenderer involves relevant qualifications, stakeholders, tools etc. and shows broad and strong collaboration. In addition, emphasis is placed on: o Involving relevant qualifications and stakeholders in problem-solving. o Demonstrating a proactive approach to identifying and addressing challenges. o Collaborating effectively with all parties to find solutions.

Oplyste optioner

  • Phase 2 (option) with a capacity of 230 m³/h output.