Gå til hovedindhold
UdbudsScanner
Alle udbud
TED773940-2026

Hesselø Offshore Wind Farm

Oplyst værdi / estimat
21.900.000.000 DKK
Frist
—
Publiceret
6.11.2026
Leveringssted (NUTS)
DK013, DNK
Ordregivers adresseområde (NUTS)
DK011

Dataposten opdateret . Datakilder, dækning og beregningsmetode.

Tildeling

Vinderlisten dækker bekendtgørelsen. Denne visning har ikke en sikker kobling mellem hver vinder, delkontrakt, værdi og udløbsdato. Se originalen for fordelingen.

Bekendtgørelsens samlede værdi: 21.900.000.000 DKKKontrakt indgået: 4.11.2026
CVR 42707279Oplyst værdi: 21.900.000.000 DKK

Beløb er offentliggjorte værdier i bekendtgørelser og kan omfatte flere delkontrakter, rammeaftalelofter og estimater. De viser ikke faktisk omsætning eller forbrug. Valutaer summeres hver for sig uden omregning. Manglende beløb er ikke nul. Se datagrundlag og metode.

Beskrivelse
The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthen the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from 29 June 2018, - Climate Agreement from 22 June 2020, - the Financial Act from 4 December 2022, - Climate Agreement regarding green electricity and heat from 25 June 2022, - Additional Agreement on the procurement details regarding 6 GW offshore wind and Energy Island Bornholm from 30 May 2023, and - Agreement on procurement frameworks for three offshore wind farms from 19 May 2025 as adjusted on 7 November 2025. This procurement concerns the establishment of one (1) new large-scale offshore wind farm named Hesselø, pursuant to Directive 2014/24/EU on public procurement as implemented into Danish law by the Danish Public Procurement Act, cf. consolidated act no. 116 of 3 February 2025 with later amendments (in Danish: Udbudsloven). The procurement procedure applicable to this procurement constitutes an open procedure, cf. section 56 of the Danish Public Procurement Act. Hesselø will in the following be called "the Offshore Wind Farm". The Concessionaire is granted a right and obligation to utilise the concession area for the establishment and operation of an offshore wind farm with a minimum capacity of 800 MW for the purpose of producing and distributing electricity at the sole risk and expense of the Concessionaire. Notwithstanding the foregoing, the Concessionaire of the Offshore Wind Farm will be economically supported for the electricity produced from the minimum capacity by a capability-based two-way contract for difference ("CfD") scheme for a period of 20 years. Under the capability-based two-way CfD scheme, the Concessionaire must make payments to the Danish State in months where the strike price (equal to the bid price of the Successful Tenderer) is lower than the reference price (calculated by the Danish Energy Agency ("DEA") as the weighted monthly average of the day-ahead prices, weighted by the maximum power production capability of the turbines or "Available Active Power"). There is no cap on the payments from the Concessionaire to the Danish State, and the Concessionaire has no option to opt out of the capability-based two-way CfD scheme. Correspondingly, in months where the strike price is higher than the reference price, the Concessionaire will receive subsidies up to a cap of DKK 21.9 billion excl. VAT (2025 prices) in the form of payments from the Danish State. The scheme constitutes State aid within the meaning of Article 107(1) of the Treaty on the Functioning of the European Union (TFEU). The minimum capacity of the Offshore Wind Farm shall be established no later than 31 December 2032. The Concessionaire will in special cases be entitled to an extension of this deadline. Connection of the Offshore Wind Farm to the Danish transmission grid is voluntary for the Concessionaire. The Concessionaire may establish overplanting capacity in excess of the required minimum capacity within the Concession Area, i.e. it is optional for the Concessionaire to establish more than 800 MW capacity within the Concession Area. Furthermore, the Concessionaire may exploit the production capacity of electricity from the Offshore Wind Farm for energy production, such as but not limited to innovative energy production (e.g. Power-to-X), if this is otherwise possible within the applicable legislation. With the sole exception of the capability-based two-way CfD scheme, the Concessionaire bears all commercial risks associated with the establishment, operation and decommissioning of the Offshore Wind Farm, including any potential overplanting capacity. Such commercial risks include, but are not limited to, legislative changes and general market conditions and demands. Additionally, the Concessionaire is responsible for the commercial risks related to any innovative energy production (e.g. Power-to-X facility). The Concessionaire shall bear the costs as stipulated in the construction permit. Please note that contrary to earlier procurements rounds concerning offshore wind the Concessionaire shall not bear the actual cost of the temporary and permanent preventive measures, which by decision of the Danish Defence must be implemented by the Concessionaire to prevent deteriorations in the quality of the current military radio communication and radar surveillance caused by the Offshore Wind Farm. Such costs will be borne by the Danish Defence. Furthermore, contrary to earlier procurements rounds for offshore wind, the Concessionaire shall not pay the cost of the offshore preliminary investigations performed by Energinet, cf. section 23 (3) of the Renewable Energy Act (RE Act), statutory order no. 132 of 6 February 2024. Such costs will be borne by the Danish State. The location site of the Offshore Wind Farm is further stated below under section "Place of Performance".

Procedure og udbudsmateriale

Oplysninger fra bekendtgørelsen kan dække flere delkontrakter. Listerne nedenfor er separate uddrag; rækkefølgen kobler ikke et kriterium til en beskrivelse eller delkontrakt. Kontrollér krav, vægtning, frister, optioner og eventuelle rettelser i originalmaterialet.

Proceduretype (kildens kode)

  • open

Tildelingskriterier

  • Bid price.

Beskrivelser af tildelingskriterier

  • Award of the Concession Agreement to the most economically advantageous tender took place on the basis of the award criterion, “price”. The award criterion, “price”, was assessed on the basis of the bid price offered by the Tenderer in the Tender Submission Letter (Annex A), in the Procurement Specifications. The offered bid price was required to constitute a price per unit of electricity in DKK/MWh excl. VAT, which the Tenderer would be guaranteed for the duration of the 20-year subsidy period. The bid price of the Successful Tenderer constitutes the so-called “strike price” under the Concession Agreement, cf. Appendix F (Concession Agreement) and Appendix 3 (Capability-Based Two-Way Contract for Difference). The Tenderer submitting the tender with the lowest offered bid price was awarded the right and obligation to establish an offshore wind farm in the concession area, as set out in Appendix 2 (Location of the Concession Area).

Andre bekendtgørelser i samme CPV-kategori

Nyeste bekendtgørelser med samme firecifrede CPV-kategori. Listen kan omfatte både åbne udbud og historik.