Framework agreement for disconnectors/earthing switches – 72,5 kV, 145 kV, 170 kV, 245 kV, 420 kV
- Ordregiver
- Energinet Eltransmission A/S
- Oplyst værdi / estimat
- 3.500.000 EUR
- Frist
- —
- Publiceret
- 8.2.2024
- Leveringssted (NUTS)
- 00
Dataposten opdateret . Datakilder, dækning og beregningsmetode.
Vinderlisten dækker bekendtgørelsen. Denne visning har ikke en sikker kobling mellem hver vinder, delkontrakt, værdi og udløbsdato. Se originalen for fordelingen.
Beløb er offentliggjorte værdier i bekendtgørelser og kan omfatte flere delkontrakter, rammeaftalelofter og estimater. De viser ikke faktisk omsætning eller forbrug. Valutaer summeres hver for sig uden omregning. Manglende beløb er ikke nul. Se datagrundlag og metode.
Procedure og udbudsmateriale
Oplysninger fra bekendtgørelsen kan dække flere delkontrakter. Listerne nedenfor er separate uddrag; rækkefølgen kobler ikke et kriterium til en beskrivelse eller delkontrakt. Kontrollér krav, vægtning, frister, optioner og eventuelle rettelser i originalmaterialet.
Proceduretype (kildens kode)
- oth-mult
Oplyste optioner
- The total purchase, for lot 1, is made for a period of 4 years from the signing of the framework agreement with the option of extending the contract twice with first 3 years and lastly 1 year. The estimated consumption during the term of the framework agreement is expected to amount to: EUR 3.500.000. The maximal contract value (total estimated sum plus extensions and revision clauses) for the duration of the framework agreement is EUR 7.000.000. The above components require a symmetrical three-phased short-circuit current for 1 second of 40 kA. In relation to this, an option is included for each component consisting of the given component having a symmetrical three-phased short-circuit current for 1 second of 63 kA.
- The total purchase, for lot 2, is made for a period of 4 years from the signing of the framework agreement with the option of extending the contract twice with first 3 years and lastly 1 year. The estimated consumption during the term of the framework agreement is expected to amount to: EUR 850.000. The maximal contract value (total estimated sum plus extensions and revision clauses) for the duration of the framework agreement is EUR 1.700.000. The above components require a symmetrical three-phased short-circuit current for 1 second of 40 kA. In relation to this, an option is included for each component consisting of the given component having a symmetrical three-phased short-circuit current for 1 second of 63 kA.
- The total purchase, for lot 3, is made for a period of 4 years from the signing of the framework agreement with the option of extending the contract twice with first 3 years and lastly 1 year. The estimated consumption during the term of the framework agreement is expected to amount to: EUR 4.500.000. The maximal contract value (total estimated sum plus extensions and revision clauses) for the duration of the framework agreement is EUR 9.000.000. The above components require a symmetrical three-phased short-circuit current for 1 second of 40 kA. In relation to this, an option is included for each component consisting of the given component having a symmetrical three-phased short-circuit current for 1 second of 63 kA.
Andre bekendtgørelser i samme CPV-kategori
Nyeste bekendtgørelser med samme firecifrede CPV-kategori. Listen kan omfatte både åbne udbud og historik.
- Hesselø Offshore Wind Farm
Danish Energy Agency
- North Sea I, Mid, Offshore Wind Farm
Danish Energy Agency
- SMC-6.2 Power Transformer and 132 kV Gas Insulated Switchgear
HOFOR Fjernvarme P/S
- Levering og installation af 50kV højspændingsudstyr til energicentral
I/S Vestforbrænding og datterselskaber
- Kontrakt om anskaffelse af elektriske anlæg til udskiftning af Banedanmarks omformerstationer (Pakke 1)
Banedanmark
- 26/04744 - Agreement for Aluminium Busbars
Energinet Eltransmission A/S