TED122319-2025
220 kV Submarine cable systems for the SLF02-project
- Ordregiver
- Energinet Eltransmission A/S
- Oplyst værdi / estimat
- 24.000.000 EUR
- Frist
- —
- Publiceret
- 24.2.2025
- Leveringssted (NUTS)
- DNK
Dataposten opdateret . Datakilder, dækning og beregningsmetode.
Beskrivelse
The Contracting Authority wants to purchase the complete functional supply of a total of approximately 20 km 220 kV three-core submarine cable (installed as 3 separate, parallel cable systems) containing an optical fibre cable, including all labour, equipment and materials required for design, fabrication and factory testing, transport of cable and accessories to a port in Zealand, Denmark, installation of transition joints and hang offs and completion and commissioning as a part of a three new 220 kV cable system connecting Vordingborg Nord (VONØ) substation to Eskilstrup (ESK) and Nørre Radsted (NRA) substations. For further details concerning the purchase, reference is made to the tender documents.
Procedure og udbudsmateriale
Oplysninger fra bekendtgørelsen kan dække flere delkontrakter. Listerne nedenfor er separate uddrag; rækkefølgen kobler ikke et kriterium til en beskrivelse eller delkontrakt. Kontrollér krav, vægtning, frister, optioner og eventuelle rettelser i originalmaterialet.
Proceduretype (kildens kode)
- neg-w-call
Tildelingskriterier
- Price
- Technical solution
- HSE and Code of Conduct
- Organization and Key Personnel and Project Programme
- Contract Terms
Beskrivelser af tildelingskriterier
- Prices must be stated in the attached schedule of prices and the defined price elements must be completed herein. Prices must be stated exclusive of VAT but inclusive of all other expenses associated with the purchase. The Carbon Footprint Tool (doc. no. 24/02646-28 “Carbon Footprint Tool”) should be completed as instructed in doc. no. 24/02646-29 “Rules regarding Carbon Footprint Tool”. The sum of climate change impact (ton Co2 footprint) in the “Summary” fan should be transferred to doc. no. 24/02646-7 “SLF02 - Procurement of 220 kV submarine cable systems - Schedules of Prices”, fan “Preliminaries” Pos. 3.5 Prices must be stated in EUR
- The evaluation will be based on a description of the offered Technical Solution. The description should demonstrate the technical level of the Supplier, and include these elements: 1. Description of the complete system design (including engineering, design, documentation, and calculations) and the robustness of the mechanical design. Reference is made doc. no. 24/02646-2 “SLF02 - Procurement of 220 kV submarine cable systems - Requirements”. 2. All requested data, cf. EGS-0085, EGS-0087 and EGS-0088. The installation process will also be part of the evaluation and will be based on the submitted installation process of accessories and of testing during the installation as described in “SLF02 – procurement of 220 kV Submarine cable systems – Technical requirements” paragraph 5. The transition joint, hang-off and other mechanical fixations will be part of the evaluation. Where more than values are required, the technical level should be explained in detail for each element as any ambiguities, missing information or uncertainties relating to the performance or characteristics of the offered solution may have a negative effect on the tender evaluation.
- Health and safety: The evaluation will be based on the tenderers Method Statement including a top-five of risks which can occur during activities performed on building site in Denmark. The HSE plan for the scope of work in Denmark will also be part of the evaluation. The HSE plan should include • Organization • Selection and control of subcontractors • Inspection and audit plan • Emergency preparedness • Accident and incident investigation • Handling and storage of material and waste
- Programme: For the evaluation of the “Project Programme” the tenderer should include a detailed and robust project specific programme which outlines how the activities will be planned from contract commencement date until taking-over certificate has been issued. The Project Programme shall honour doc. no. 24/02646-6 “Preliminary Time Schedule” included in the tender material. The documentation should include a detailed description of how the identified activities are planned and executed. Further, a GANTT-chart out-lining the overall time schedule should be submitted. Concerning the activities on site in Denmark the tenderer should include a detailed description of the manpower used on site for supervision and jointing work. Reference is made to doc. no. 24/02180-17 “Preliminary Time Schedule” and should include detailed planning of the supervision activities and jointing work on site
- For the purpose of evaluation, the tenderer may propose deviations to the contract terms not identified as mandatory parts cf. section 3.7.1. The contract terms are considered: • Contract Agreement (doc. No. 24/02646-27) • Appendix 1: General Terms and Conditions for Purchase (doc. No. 24/02646-26), If the tenderer wishes to propose deviations these should be stated in doc. no. 24/02646-15 - Clarification lists. The proposed deviations to the contract terms must be stated in the spreadsheet marked “Legal clarification”. The proposed deviations should be explicit and with explanation as to why they are made.
Oplyste optioner
- Option for spare parts and EQ-test according to Schedule of prices
Aflevering af tilbud
Andre bekendtgørelser i samme CPV-kategori
Nyeste bekendtgørelser med samme firecifrede CPV-kategori. Listen kan omfatte både åbne udbud og historik.
- Udbud af rammeaftale på leje af letvogne mv.
Københavns Kommune - Økonomiforvaltningen
- Rammeaftale på luftledningsmontage
Energinet Eltransmission A/S
- Maabjerg Energy Center' udbud vedr. udskiftning af affaldskran
Maabjerg Energy Center - Bioheat & Power A/S
- NEA and SLF02 – Procurement of 400 kV and 132 kV cable systems
Energinet Eltransmission A/S
- Kvalifikationsordning til indkøb af Grossistvarer og Akku-værktøj
N1 A/S
- 26/11399 - Rammeaftale vedrørende anskaffelse af kabler til datacentre
Energinet