TED844128-2025

Purchase of 220 kV AC underground cables, accessories, supervision and jointing work for three cable systems (with approximate 90 km total length for all systems)

Oplyst værdi / estimat
55.500.000 EUR
Frist
Publiceret
18.12.2025
Leveringssted (NUTS)
DNK

Dataposten opdateret . Datakilder, dækning og beregningsmetode.

Tildeling

Vinderlisten dækker bekendtgørelsen. Denne visning har ikke en sikker kobling mellem hver vinder, delkontrakt, værdi og udløbsdato. Se originalen for fordelingen.

Bekendtgørelsens samlede værdi: 36.369.075 EURKontrakt indgået: 10.12.2025
Registreringsnr. 138-81-47634Oplyst værdi: 36.369.075 EUR

Beløb er offentliggjorte værdier i bekendtgørelser og kan omfatte flere delkontrakter, rammeaftalelofter og estimater. De viser ikke faktisk omsætning eller forbrug. Valutaer summeres hver for sig uden omregning. Manglende beløb er ikke nul. Se datagrundlag og metode.

Beskrivelse
The Contracting Authority wants to purchase 220 kV AC underground cables, accessories, supervision and jointing work for three cable systems (with approximate 90 km total length for all systems) to be installed in the south and eastern part of Zealand, Lolland and Falster, Denmark.

Procedure og udbudsmateriale

Oplysninger fra bekendtgørelsen kan dække flere delkontrakter. Listerne nedenfor er separate uddrag; rækkefølgen kobler ikke et kriterium til en beskrivelse eller delkontrakt. Kontrollér krav, vægtning, frister, optioner og eventuelle rettelser i originalmaterialet.

Proceduretype (kildens kode)

  • neg-w-call

Tildelingskriterier

  • Price
  • Technical Solution
  • HSE and Code of Conduct
  • Organization and Key Personnel and Programme
  • Contract Terms

Beskrivelser af tildelingskriterier

  • Prices must be stated in the attached schedule of prices and the defined price elements must be completed herein. Prices must be stated exclusive of VAT, but inclusive of all other expenses associated with the purchase. The Carbon Footprint Tool (doc. no. 24/02180-13 “Carbon Footprint Tool”) should be completed as instructed in doc. no. 24/02180-14 “Rules regarding Carbon Footprint Tool”. The sum of climate change impact (ton CO2 footprint) in the “Summary” fan should be transferred to the Schedule of Prices fan “Preliminaries” Pos. 3.4 Prices must be stated in EUR.
  • The evaluation will be based on a description of the offered Technical Solution. The description should demonstrate the technical level of the, and include these elements: 1. Description of the complete system design (including engineering, design, documentation, and calculations) and the robustness of the mechanical design cf. technical requirements (24/02180-5) All requested data, cf. EGS-0084 and EGS-0085. The installation process will also be part of the evaluation and will be based on the submitted installation process of accessories and of testing during the installation as described in “SLF02 – procurement of 220 kV underground cable systems – Technical requirements” paragraph 5. Where more than values are required, the technical level should be explained in detail for each element as any ambiguities, missing information or uncertainties relating to the performance or characteristics of the offered solution may have a negative effect on the tender evaluation.
  • An overall evaluation will be made of this sub-criterion.
  • Programme: For the evaluation of the “Project Programme” the tenderer should include a detailed and robust project specific programme which outlines how the activities will be planned from contract commencement date until taking-over certificate has been issued. The Project Programme shall honour doc. no. 24/02180-17 “Preliminary Time Schedule” included in the tender material. The documentation should include a detailed description of how the identified activities are planned and executed. Fur-ther, a GANTT-chart out-lining the overall time schedule should be submitted. Concerning the activities on site in Denmark the tenderer should include a detailed description of the manpower used on site for supervision and jointing work. Reference is made to doc. no. 24/02180-17 “Preliminary Time Schedule” and should include detailed planning of the supervision activities and jointing work on site.
  • For the purpose of evaluation, the tenderer may propose deviations to the contract terms not identified as mandatory parts cf. section 3.7.1. The contract terms are considered: • Contract Agreement (doc. No. 24/02180-24) • Appendix 1: General Terms and Conditions for Purchase (doc. No. 24/02180-23), If the tenderer wishes to propose deviations these should be stated in doc. no. 24/02180-19 - Clarification lists The proposed deviations to the contract terms must be stated in the spreadsheet marked “Legal clarification”. The proposed deviations should be explicit and with explanation as to why they are made.