TED349400-2026
LOT 1 - Reservoir logging and well diagnostics
- Ordregiver
- Gas Storage Denmark A/S
- Værdi
- 4.360.000 EUR
- Frist
- —
- Publiceret
- 21.5.2026
- CPV
- 76000000, 76443000, 76300000, 76533000, 76100000, 76440000, 76510000, 76537000, 76110000
- NUTS
- DK022, DK050, DNK
Beskrivelse
Expected consumption: 4.360.000 EUR. Maximum value: 6.530.000 EUR if the contractual expansions of 2 x 25 % of the value are both activated. The overall purpose of the Framework Agreement is for Supplier to support Gas Storage Denmark (GSD) in the planning and execution of GSD's Reservoir logging and well diagnostics covering Pulsed neutron, Production Logging operations and data interpretation. Other E-line work such as Re-Perforating, Calliper of Tubing, Ultrasonic measurement, running Camera and leak detection can be expected in connection with yearly requirements for Pulsed neutron logging. GSD requires the Supplier to provide Integrated Wireline Trucks - accompanied, if possible - by a trailer fitted with all additional required equipment for the Works. This is to minimize additional trucks and personnel on the well site and to assure that transfer of equipment between wells can be conducted with minimum use of additional trucks and crane assistance. For more information see Appendix 2: Scope of Works LOT 1 (doc. no. 25/18898-1) and 2A: Technical and Functional Requirements LOT 1 (doc. no. 25/18898-2). The Contracting Authority wants to ensure robustness for Gas Storage Denmark regarding services of importance. For that reason, the Scope of Works for LOT 1 and LOT 2 are overlapping with specific tools that are required for investigation of the condition of the wells. The reasoning is that it should be possible for GSD to conduct additional investigations – and therefore minimize mobilizations – when already conducting services under the respective lot. Consequently, the Contracting Authority will not award LOT 1 and LOT 2 to the same Supplier. Tenders can be submitted for all lots, but the tenderers who have applied and been prequalified to both LOT 1 and LOT 2 are required to indicate an order of priority in the case they will have the most economically advantageous tender based on the best price-quality ratio for both LOT 1 and for LOT 2. In this case the applicant will be awarded the 1st priority lot but will be excluded from the evaluation of the 2nd priority lot. The priority is to be submitted by filling out the attached template: Template 4: Priority between LOT 1 and LOT 2 (doc. no. 25/12155-45) in connection with the submission of the initial tender – and only by tenderers who have applied and been prequalified to both LOT 1 and LOT 2. Considering the above-described limitations - subsequent contracts under the framework agreement will be awarded directly to the supplier who submitted the most economically advantageous tender, see section 4.1. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.